|
Quality transform good product.
Description | H Panel |
Relay Tripping Protection | Given At 2 Side |
Voltage Current Measurement | Given At 2 Side |
Push Buttons | Seperately Given As Per Test Requirement |
Contactors | 5 Nos. Contactors Are Given |
Rotary Switch | 3 Nos. |
Voltage & Current Measuring Reading | 3-Ph Reading Visible At a Time |
Control Circuit Wires | Use Of 0.75 |
For Safety Purpose | Providing 2Amp., Fuse And Mcb |
Main Incoming Supply | Mccb Is Given |
Testing Measurement Ct | 0.2 Class |
Wheels | Given |
Paint And Powder Coating Process | 24 Hrs |
Gaurantee | 15 Months Warrenty For Paint is Given |
Door Lock Provision | Given |
Dimmer Zero Lock Provision | Given |
Hooter | Given |
Protection For All The Test | All Test Have Given Seperatly Protection |
For Testing Of Ratio Resi., Meggar,Oc,Sc,Temp. Rise | Automatic Report Generating Facility Is Given (Customise With Extra Payable Charges) |
Warranty | 15 Months |
Extra Charges | Visiting And Inspection At Our Hand No Extra Charges But Customer Visit Factory Charge Will Be Extra Payable |
Delivery Period | Minimum 3 Weeks (Customise) |
For Wiring Of Control Ckt Panel | Drawing Is Not Provided To Customer (Power Wiring Drawing Is Provided) |
All Switch Gear Materials | Use Standard Make |
Cost | 10 - 15% Less Than Other Partys |
Performance Of Test | OC, SC, HV, DVDF Test Is Operated Manually And Automatically (Customise) |
CT Ptratio Change | Rotary Switch Given For It |
Require Man Power | No Man Power Require In Automatic Panels(Customise ), Panel Can Perform The Readings Of Every Intervals Manually As Well As Automatically (Customise) |
4.8/5
Reviewed by 6 Users
Most Relevant Reviews